chch.live a track

Walk and bike track through Addington (404)

walk · bike · 335 m · Christchurch

From the air

aerial view of Walk and bike track through Addington and the ground around it
From the air, Imagery © Esri, Maxar, Earthstar Geographics

The line it runs

It passes through Addington, every suburb the line crosses, not just the one its middle sits in.

More tracks through Addington

The reports along it

538 reports pinned within 150 m of the drawn line, most often Graffiti & vandalism and Roads & footpaths, 377 with a photograph. A pin is where a reporter stood, not a claim about the track itself.

  • Overgrown Vegetation, 11 Deans Avenue, Addington, Christchurch 8011, New Zealand · 24 September 2026
  • Road Signage, 11 Deans Ave, Canterbury, Christchurch 8011, New Zealand · 17 September 2026
  • Pothole, Deans Ave, Canterbury, Christchurch 8011, New Zealand · 16 September 2026
  • Water Leak, 3 Pope Street, Riccarton, Christchurch 8011, New Zealand · 25 August 2026
  • Fallen Tree, 17–19 Lester Ln, Canterbury, Christchurch 8011, New Zealand · 18 August 2026
  • Dumped Rubbish, 19–23 Lester Ln, Canterbury, Christchurch 8011, New Zealand · 20 July 2026
  • Pothole, 3 Deans Avenue, Addington, Christchurch 8011, New Zealand · 3 July 2026
  • Dumped Rubbish, 55 Blenheim Rd, Canterbury, Christchurch 8011, New Zealand · 27 June 2026
  • Sewer General, 29A Mayfair St, Canterbury, Christchurch 8011, New Zealand · 4 June 2026
  • Traffic Signals, 6 Moorhouse Avenue, Addington, Christchurch 8011, New Zealand · 13 May 2026
  • Dumped Rubbish, 6a Pope Street, Addington, Christchurch 8011, New Zealand · 10 May 2026
  • Graffiti on a fence, building or structure, 25 Deans Ave, Canterbury, Christchurch 8011, New Zealand · 25 April 2026

Environment Canterbury / Canterbury Maps, the walking, bike, horse and off-road track layers · refreshed 29 September 2026. The layer names Christchurch City Council as the track’s keeper.

What stood on this ground before → · On the map →

Questions, answered briefly

How long is this track?

335 m of drawn line.

What can you do on this track?

The layers open it to walking, biking.

Where does this track run?

Through Addington, every suburb the line crosses.

Who looks after this track?

Christchurch City Council, as the layer names the keeper.

Where does this record come from?

Environment Canterbury’s open track layers, the walking, bike, horse and off-road layers read together.