chch.live a track

Walk and bike track through Woolston (83)

walk · bike · 1.1 km · Christchurch

From the air

aerial view of Walk and bike track through Woolston and the ground around it
From the air, Imagery © Esri, Maxar, Earthstar Geographics

The line it runs

It passes through Woolston, every suburb the line crosses, not just the one its middle sits in.

Runs from Woolston Borough Monument and Setting to Dwelling and Setting, The Hollies, the named ground at each end of the drawn line.

The lines it meets

Other open lines whose drawn course comes within 40 m of this one, the layer splits one trail into many features, so a line it touches is often the same walk’s next leg.

More tracks through Woolston

What carries it

Council-registered structures the drawn line enters or runs within a few metres of, the bridges, boardwalks and steps the route is made of. The register’s names are site labels, so each is "at" the ground it stands in.

  • A jetty
  • A set of steps, 6 steps · built 2018
  • A jetty at Christchurch Quay Reserve, 4.5 m long · built 2018
  • A set of steps at Christchurch Quay Reserve, 3 steps · built 2018
  • A set of steps at Christchurch Quay Reserve, 6 steps · built 2018
  • A jetty at Heathcote Riverbank Tl East, built 2015
  • A viewing platform at Christchurch Quay Reserve, 5.7 m² deck · built 2006
  • A set of steps, 3 steps · built 2018
  • A set of steps, 3 steps · built 2018

The register along it

Heritage-register places within 150 m of the line, what stood on the ground it crosses, or still does.

The reports along it

2,139 reports pinned within 150 m of the drawn line, most often Graffiti & vandalism and Rubbish & dumping, 1,714 with a photograph. A pin is where a reporter stood, not a claim about the track itself.

  • Dumped Rubbish, 26 Richardson Tce, Canterbury, Christchurch 8023, New Zealand · 9 October 2026
  • Graffiti on a traffic light pole or cabinet, or wa, 560 Ferry Road, Woolston, Christchurch 8023, New Zealand · 5 October 2026
  • Dumped Rubbish, 115 Clarendon Terrace, Woolston, Christchurch 8023, New Zealand · 4 October 2026
  • Dumped Rubbish, 102 Wildberry Street, Woolston, Christchurch 8023, New Zealand · 4 October 2026
  • Litter, 24 Richardson Terrace, Woolston, Christchurch 8023, New Zealand · 3 October 2026
  • Dumped Rubbish, 2 Marshall Street, Woolston, Christchurch 8023, New Zealand · 3 October 2026
  • Dumped Rubbish, 583 Ferry Road, Woolston, Christchurch 8023, New Zealand · 3 October 2026
  • Dumped Rubbish, 121 Clarendon Tce, Canterbury, Christchurch 8023, New Zealand · 3 October 2026
  • Dumped Rubbish, 76–88 Richardson Tce, Canterbury, Christchurch 8023, New Zealand · 28 September 2026
  • Dumped Rubbish, Canterbury, Christchurch 8023, New Zealand · 28 September 2026
  • Dumped Rubbish, 583 Ferry Road, Woolston, Christchurch 8023, New Zealand · 28 September 2026
  • Damaged Asset – CCC contractor, 76 Richardson Tce, Canterbury, Christchurch 8023, New Zealand · 28 September 2026

Environment Canterbury / Canterbury Maps, the walking, bike, horse and off-road track layers · refreshed 29 September 2026. The layer names Christchurch City Council as the track’s keeper.

What stood on this ground before → · On the map →

Questions, answered briefly

How long is this track?

1.1 km of drawn line.

What can you do on this track?

The layers open it to walking, biking.

Where does this track run?

Through Woolston, every suburb the line crosses.

Who looks after this track?

Christchurch City Council, as the layer names the keeper.

Where does this record come from?

Environment Canterbury’s open track layers, the walking, bike, horse and off-road layers read together.