Roading/Streets
Reported Friday, 15 April 2022 at 1:24 pm, 69A Oxford Street, Lyttelton 8082, New Zealand.
The reporter’s words
Repair to damaged brick barrel stormwater pipe has not reinstated the kerb and channel. Instead the asphalt subcontractor has formed a shallow dish. But I doubt this has the flow capacity needed and a big rain event could lead to flooding of adjacent property. Please send an engineer to inspect.
The filing
- Filed
- Friday, 15 April 2022 at 1:24 pm
- Report number
- #2,292,180
- Filed under
- roads
- Coordinates
- the pin on the map →
The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture)5 m away · resolved 29 Apr 2022, took 14 days · probably the same job, filed through both doors
- Temporary Traffic Management8 m away · resolved 2 May 2022, took 18 hours
- Damaged Bin9 m away · resolved 3 Sept 2024, took 8 days
- Residential Property Files9 m away · resolved 9 Aug 2024, took 44 hours
- Residential LIM9 m away · resolved 8 Aug 2024, took 9 days
- Residential LIM Fast Track9 m away · resolved 15 Sept 2026, took 5 days
- Residential Property Files9 m away · resolved 8 days ago, took 4 days
- Residential Property Files9 m away · resolved yesterday, took 3 days
MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →
Where this sits
The address69A Oxford Streetthe only report the feed has filed at this address, the address’s whole recordThe streetOxford Streetthe street’s record, every report on itThe suburbLytteltonthe suburb, in depthThe problemRoading/Streetsevery filing of its kind on the city’s booksThe date15 Aprilthis date in the archive, across the yearsThe year2022the year’s shelf and ledgerThe mapOn the mapthe pin, among its neighboursBeforeWhat stood herewhat the archive knows of this ground
The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.