chch.live one report, whole

Pavement - Damaged

Reported Saturday, 27 August 2022 at 8:11 am, 36 Gisele Crescent, Halswell, Christchurch 8025, New Zealand.

The photograph attached to this pavement - damaged report
The photograph the reporter attached, on the Halswell wall with the rest.

The reporter’s words

The hole in the footpath is right by the Orion box & underneath the hole lies the fibre cables, 1weekend we had a heavy downpour of rain all weekend and us & our neighbor lost our fibre connection because of the hole. Do u know how many bloody times I have phoned about the hole it ruined a brand new pair of Sketches shoes, as was trying to get yr blasted weeds out between edging & asphalt, now the loss of no live streaming as NO FIBRE BECAUSE WHAT LIES UNDER THE FOOTPATH THE "CABLES", WHEN YOU HOSE DOWN YR DRIVEWAY & THE FOOTPATH IT GOES DOWN THE HOLE & BUBBLES UP IN THE END IN THE LAWN, ABOUT MY SHOES CCC,OWES ME A NEW PAIR, ARRANGE IT AS U WASTE SO MUCH $ ON ROADS ETC THAT DON'T NEED DOING. 38 GISELE CRES BROKEN FOOTPATH ALL UP, SPREAD CONCRETE OVER IT, DIGGER MARKS ON THE DRIVEWAY 36 GISELE CRESCENT, NEEDS WATER BLASTING OFF, AS INDUSTRIAL 1 WON'T REMOVE MARKS LOOKS TACKY ALL THINGS IN PHOTOS & WHAT IS WRITTEN NEEDS FIXING, AS SICK OF PHONING DUMB ARSES@ CCC 20+TIMES NO BRAIÑS

The filing

Filed
Saturday, 27 August 2022 at 8:11 am
Report number
#2,575,352
Filed under
roads
Coordinates
the pin on the map →

Also at this address one of 9

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.