Reported Thursday, 5 April 2018 at 12:13 pm, 93, Apsley Drive, Avonhead, 8042, Canterbury.

The reporter’s words

The work done during Enable optic fibre network means that a hurdle / hump has been created on the surface of the road, with BLOCKS / prevents the flow of water towards the drain. The hump / hurdle is about an inch high. Difficult to photograph but can be seen easily in person at site.

The filing

Filed
Thursday, 5 April 2018 at 12:13 pm
Report number
#401,311
Filed under
water
Coordinates
the pin on the map →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 5 Sept 2026, it has not been listed since. The record here does not move.