chch.live one report, whole

Sediment - Construction

Reported Saturday, 13 July 2024 at 9:06 am, 94A Packe Street, Edgeware, Christchurch 8013, New Zealand.

The photograph attached to this sediment - construction report
The photograph the reporter attached, on the Edgeware wall with the rest.

The reporter’s words

Erosion and sediment controls have not been effectively implemented or maintained through the duration of construction, they very irregularly clean sediment off the footpath and out of the sump. The sumps should have filterpod catch pit filters installed in them with the amount of sediment being tracked onto the road. Not only is it becoming and environment risk but an issue to neighbouring properties wanting to walk over a mud clogged footpath. Note: oil or other hydrophobic substance in kerb.

The filing

Filed
Saturday, 13 July 2024 at 9:06 am
Report number
#4,879,970
Filed under
water
Coordinates
the pin on the map →

Also at this address one of 2

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.