chch.live one report, whole

Water General

Reported Monday, 1 June 2026 at 10:10 am, 32 Jacksons Rd, Canterbury, Lyttelton 8082, New Zealand.

The photograph attached to this water general report
The photograph the reporter attached, on the Lyttelton wall with the rest.

The reporter’s words

Work was just completed on finishing up the retaining wall which we are happy about. What we are not happy about is the water mains pipe has been left exposed and stuck right through the center of the footpath shoulder. When can this be dealt with? I think the pipe should not be exposed like this and it’s prone to failure or damage.

The filing

Filed
Monday, 1 June 2026 at 10:10 am
Report number
#8,341,310
Filed under
water
Coordinates
the pin on the map →

Also at this address one of 4

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.