chch.live a track

Walk and bike track through Burnside (241)

walk · bike · 1.4 km · Christchurch

From the air

aerial view of Walk and bike track through Burnside and the ground around it
From the air, Imagery © Esri, Maxar, Earthstar Geographics

The line it runs

It passes through Burnside, every suburb the line crosses, not just the one its middle sits in.

The lines it meets

Other open lines whose drawn course comes within 40 m of this one, the layer splits one trail into many features, so a line it touches is often the same walk’s next leg.

More tracks through Burnside

The reports along it

376 reports pinned within 150 m of the drawn line, most often Roads & footpaths and Water & drains, 275 with a photograph. A pin is where a reporter stood, not a claim about the track itself.

  • Traffic Signals, 363 Memorial Avenue, Burnside, Christchurch 8053, New Zealand · 6 October 2026
  • Water Pollution - Sediment, 25A Sheffield Cres, Canterbury, Christchurch 8053, New Zealand · 1 October 2026
  • Dumped Rubbish, 70 Roydvale Avenue, Burnside, Christchurch 8053, New Zealand · 28 September 2026
  • Dumped Rubbish, 376 Memorial Avenue, Burnside, Christchurch 8053, New Zealand · 25 September 2026
  • Abandoned Vehicle, 33 Sir William Pickering Dr, Canterbury, Christchurch 8053, New Zealand · 16 September 2026
  • Abandoned Vehicle, 33 Sir William Pickering Dr, Canterbury, Christchurch 8053, New Zealand · 16 September 2026
  • Abandoned Vehicle, 28 Sir William Pickering Dr, Canterbury, Christchurch 8053, New Zealand · 16 September 2026
  • Overgrown Vegetation, 60 Roydvale Avenue, Burnside, Christchurch 8053, New Zealand · 10 September 2026
  • Overgrown Vegetation, 62 Roydvale Avenue, Burnside, Christchurch 8053, New Zealand · 1 August 2026
  • Damaged Road, 25 O’Connor Pl, Canterbury, Christchurch 8053, New Zealand · 31 July 2026
  • Water Leak, 19 Sheffield Cres, Canterbury, Christchurch 8053, New Zealand · 30 July 2026
  • Trees - General, 4–10 Winslow St, Canterbury, Christchurch 8053, New Zealand · 30 July 2026

Environment Canterbury / Canterbury Maps, the walking, bike, horse and off-road track layers · refreshed 29 September 2026. The layer names Christchurch City Council as the track’s keeper.

What stood on this ground before → · On the map →

Questions, answered briefly

How long is this track?

1.4 km of drawn line.

What can you do on this track?

The layers open it to walking, biking.

Where does this track run?

Through Burnside, every suburb the line crosses.

Who looks after this track?

Christchurch City Council, as the layer names the keeper.

Where does this record come from?

Environment Canterbury’s open track layers, the walking, bike, horse and off-road layers read together.