chch.live a track

Walk and bike track through Burnside (246)

walk · bike · 276 m · Christchurch

From the air

aerial view of Walk and bike track through Burnside and the ground around it
From the air, Imagery © Esri, Maxar, Earthstar Geographics

The line it runs

It passes through Burnside, every suburb the line crosses, not just the one its middle sits in.

Runs out and back to Burnside Park, the named ground at each end of the drawn line.

More tracks through Burnside

The green it crosses

Parks and reserves whose drawn outline the line enters, measured against the line itself, not a buffer around it.

The reports along it

338 reports pinned within 150 m of the drawn line, most often Trees & parks and Rubbish & dumping, 272 with a photograph. A pin is where a reporter stood, not a claim about the track itself.

  • Park - General Request, 340 Avonhead Road, Burnside, Christchurch 8053, New Zealand · 3 October 2026
  • Pavement - Damaged, 316 Memorial Avenue, Burnside, Christchurch 8053, New Zealand · 2 October 2026
  • Public Toilet, 340 Avonhead Road, Burnside, Christchurch 8053, New Zealand · 26 September 2026
  • Playground Equipment, Canterbury, Christchurch 8053, New Zealand · 14 September 2026
  • Playground Equipment, 334 Avonhead Rd, Canterbury, Christchurch 8042, New Zealand · 12 September 2026
  • Litter, 351–353 Avonhead Rd, Canterbury, Christchurch 8042, New Zealand · 9 September 2026
  • Dumped Rubbish, Canterbury, Christchurch 8053, New Zealand · 8 September 2026
  • Facility - General Request, Burnside Park 336 Avonhead Road, Burnside, Christchurch 8053, New Zealand · 28 August 2026
  • Pavement - Damaged, Canterbury, Christchurch 8053, New Zealand · 20 August 2026
  • Dumped Rubbish, 371 Avonhead Road, Avonhead, Christchurch 8042, New Zealand · 16 August 2026
  • Water General, 336 Avonhead Road, Burnside, Christchurch 8053, New Zealand · 3 August 2026
  • Hazard, vehicle, 25 Arlington St, Canterbury, Christchurch 8053, New Zealand · 17 July 2026

Environment Canterbury / Canterbury Maps, the walking, bike, horse and off-road track layers · refreshed 29 September 2026. The layer names Christchurch City Council as the track’s keeper.

What stood on this ground before → · On the map →

Questions, answered briefly

How long is this track?

276 m of drawn line.

What can you do on this track?

The layers open it to walking, biking.

Where does this track run?

Through Burnside, every suburb the line crosses.

Who looks after this track?

Christchurch City Council, as the layer names the keeper.

Where does this record come from?

Environment Canterbury’s open track layers, the walking, bike, horse and off-road layers read together.