Walk and bike track through Linwood (64)
walk · bike · 40 m · Christchurch
From the air
The line it runs
It passes through Linwood, every suburb the line crosses, not just the one its middle sits in.
More tracks through Linwood
- Track through Christchurch, 3.5 km
- Track through Christchurch, 1.8 km
- Track through Christchurch, 1.6 km
- Track through Christchurch, 1.5 km
- Track through Christchurch, 1.3 km
- Track through Christchurch, 1.3 km
- Track through Christchurch, 1.3 km
- Track through Christchurch, 1.2 km
The reports along it
793 reports pinned within 150 m of the drawn line, most often Rubbish & dumping and Graffiti & vandalism, 683 with a photograph. A pin is where a reporter stood, not a claim about the track itself.
Dumped Rubbish, 540 Gloucester Street, Linwood, Christchurch 8011, New Zealand · 14 October 2026
Street Gutters / Storm Water, 116 England Street, Linwood, Christchurch 8011, New Zealand · 9 October 2026
Dumped Rubbish, 471 Worcester Street, Linwood, Christchurch 8011, New Zealand · 30 September 2026
Hazard, vehicle, 534 Gloucester Street, Linwood, Christchurch 8011, New Zealand · 22 September 2026
Dumped Rubbish, 448 Worcester Street, Linwood, Christchurch 8011, New Zealand · 21 September 2026
Graffiti on a fence, building or structure, 475 Worcester Street, Linwood, Christchurch 8011, New Zealand · 8 September 2026
Graffiti on a fence, building or structure, 475 Worcester Street, Linwood, Christchurch 8011, New Zealand · 8 September 2026
Graffiti on a fence, building or structure, 510 Gloucester Street, Linwood, Christchurch 8011, New Zealand · 3 August 2026
Graffiti on a fence, building or structure, 510 Gloucester Street, Linwood, Christchurch 8011, New Zealand · 3 August 2026
Rubbish and Bins - General, 139B England Street, Linwood, Christchurch 8011, New Zealand · 27 July 2026
Rubbish and Bins - General, 126 England Street, Linwood, Christchurch 8011, New Zealand · 14 July 2026
Hazard, vehicle, 534 Gloucester Street, Linwood, Christchurch 8011, New Zealand · 9 July 2026
Environment Canterbury / Canterbury Maps, the walking, bike, horse and off-road track layers · refreshed 15 October 2026. The layer names Christchurch City Council as the track’s keeper.
What stood on this ground before → · On the map →
Questions, answered briefly
40 m of drawn line.
The layers open it to walking, biking.
Through Linwood, every suburb the line crosses.
Christchurch City Council, as the layer names the keeper.
Environment Canterbury’s open track layers, the walking, bike, horse and off-road layers read together.