chch.live the pedal network

Te Ara Ihutai Coastal Pathway

One of the Major Cycle Routes, the named spines of Christchurch’s pedal network. 7.0 km of it on the record, 7 recorded pieces, through Mount Pleasant, Redcliffs, Moncks Bay, Clifton, Sumner, Scarborough.

Length on the books
7.0 km
7 recorded segments
Separated
0%
0.0 km behind something solid
In service
91%
of the route’s length on the books
Suburbs crossed
6
outlines the line enters

The route, drawn

BromleyCliftonFerrymeadHeathcote ValleyMoncks BayMount PleasantRedcliffsRichmond HillScarboroughSouthshoreSumnerte-onepoto-taylors-mistakeWoolstonUnclassifiedShared path

Each piece coloured by the kind of riding it is : separated paths strongest, painted lanes teal, shared and quiet ways faint. The route’s own name is the programme’s.

What the route is made of

shared path 6.4 km 91% of the route
unclassified 0.6 km 9% of the route

The ground it crosses

The record behind this

Christchurch City Council’s open data, the Cycleway layer’s MajorCyclewayName is the record’s own attribution. The status and the lengths are the asset register’s; a named route is a spine the programme still extends. The whole network is drawn at /cycleways, and live on the map’s cycleway layer.

This page as markdown: /cycleway/te-ara-ihutai-coastal-pathway.md · the whole network: /cycleways.json.